PDF Print

Installation Type:

RETROFIT

We keep your existing frame

BRICK TO BRICK

Full removal of the wood frame, (where exterior finish is brick or concrete).

STUD TO STUD

Full removal of the wood frame

 

In Brick to Brick or Stud to Stud installations the new wood finish (frame and casing) inside has to be painted after installation. In Brick to Brick or Stud to Stud installations on Kitchen and Bathroom windows that have tiles or back splash around the trim – Aurora Windows & Doors LTD. does not take responsibility on chipped tiles.

After building a new Bay, Bow, or Aircon windows the new wood finish inside (shelf, header, frame and casing) has to be painted after installation.

Unless otherwise specified in the contract, it is the Customer’s responsibility to paint the wood finish (frame and casing) inside the house after installation.

Unless otherwise specified in the contract, Aurora Windows & Doors LTD. will not replace Roof, Box or install siding on existing Bay or Bow windows.

POST IN – after retrofit installation on Combination window, Existing bay or Bow windows leave the wood posts intact. Does not require touch up and paint done on the inside.

POST OUT – after retrofit installation on Combination window, existing Bay or Bow windows remove the wood posts. Does require touch up and paint done on the inside.

DOOR INSTALLATION: Full removal of the frame (excluding Patio Sliding Door and Aluminum Storm Door). Customer must paint all interior such as jamb and casing (excluding Fiberglass doors) within 45 days after installation. Failure to paint will void all warranties.

Unless specified in the contract, Aurora Windows & Doors LTD. will not reinstall old Storm door/s on newly installed exterior door/s.

CUT OUT – when cutting brick, concrete or siding, Aurora Windows & Doors LTD. will not be responsible for concrete latch finish, any electrical wiring or any plumbing going through the area of the cut.

Unless otherwise specified in the contract, Customer must supply the hardware (Deadbolt and Handle-set) for the new door/s, excluding Patio door handle and Storm door handle. Patio door handle and storm door handle will be supplied with the door/s. Aurora Windows & Doors LTD. will install the locks supplied by the Customer at no charge as long as the lock can be installed on the new door/s.

Aurora Windows & Doors LTD. is not responsible for the reconnecting of the alarm system on newly installed windows or doors done by Aurora Windows & Doors LTD.

It is the Customer’s responsibility to remove and re-install all windows or doors coverings, such as: Blinds, Shutters, Drapes or any other types of coverings.

Due to safety regulations all installers must wear safety shoes at all times inside the house, therefore it is the Customer’s responsibility to provide floor coverings for all common areas.

Unless otherwise specified in the contract, all steel frames on basement windows must be painted inside and outside by the customer following installation of the new windows.

It is recommended that basement windows with wood frames be installed Frame to Frame (retrofit). This is due to construction of concrete or brick around the windows frame.

Unless otherwise specified in the contract, interior color of all windows and doors is WHITE.

It is Customer’s responsibility to clear the immediate working area from furniture inside and plants, trees and flowers outside, since Aurora Windows & Doors LTD. will not take responsibility on the damage that might resoled of installation done window/s and/or door/s.

Installers’ cleaning upon completion of installation includes construction garbage disposal and basic sweeping of the floor in the window/door area.